BSV11104 – Procurement Strategy
COURSEWORK 2

Module title Procurement Strategy
Module number BSV11104
Coursework number Coursework 2 of 2
Module leader Dr Andrew Smith
Submission date No later than 4.00pm Friday 10th April 2020
Submission
guidelines
Your completed coursework should be submitted via
the Turnitin assignment submission box within the
module space on Moodle.
Your attention is drawn to the University’s ‘Fit-to-Sit’
and Extenuating Circumstances guidelines as well as
the University’s Academic Conduct regulations.

 You are advised to keep a copy of the coursework as your submitted work will not
be returned.
 The assignment will be scrutinised independently by the external examiner
appointed to the module.
Page 2 of 6
BSV11104: Procurement Strategy
Coursework 2 – 2019/2020
Assignment Brief: Analysing Framework Agreements
This assignment requires you to consider the below extract from an industry news
journal and write a detailed report on the risks and benefits of Frameworks
Agreements.
You will consider this in relation to other procurement strategies including Partnering
Arrangements.
Procurement organisation Scape Group has appointed Robertson as lead contractor
to the Scottish lot of a £7 billion national construction framework.
With a total value of £750 million, the Major Works Scotland framework includes
projects such as regeneration schemes, schools, universities and colleges, hospitals,
central government buildings and housing ranging between £2m to £20m.
Willmott Dixon, Wates and Lendlease have been appointed as lead contractors for the
other four national frameworks, which has the highest total value of any framework
ever procured in the UK.
Industry news journal April 2017
Your report will cover the following:
1. Consider the likely issues and wider implications to the contractor of being
awarded this framework.
2. Consider the risks and benefits to the Client and the contractor of this
agreement.
3. Consider the wider implication on the industry resulting from these high value
frameworks.
Page 3 of 6
4. Consider alternative ways in which these works could have been procured.
5. Provide reasoning as to why this method was chosen and your opinion on the
merit of this.
General Requirements
Your assignment is to be produced in A4 printed format and should comprise no more
than 2,000 words. This assignment contributes to 50% of the module assessment.
A comprehensive reference list must be included. References should be made to
all information sources used and these should be in the Harvard referencing style.
Submissions made after 4.00pm on the due date will be deemed to have been
received the following day and will therefore be capped in accordance with the
University’s regulations regarding late submission.
Page 4 of 6
Marking Scheme

Criteria Marks
Introduction
 Clear introduction to background and purpose of report; brief
introduction to findings, conclusions and recommendations.
10
Consideration of likely issues and wider implications
 Identification of risks and benefits;
 Consideration of generic wider implications;
 Clear discussion of any implications arising.
20
Consideration of alternative procurement strategies
 Identification of appropriate alternatives;
 Consideration of the merit of alternatives;
 Clear explanation as to suitability of alternatives
20
Critical evaluation of selected method
 Demonstration of criticality in evaluating the effectiveness of the
selected approach
 Evaluation fully supported by references to appropriate research.
25
Conclusions and recommendations
 Clear and reasoned conclusions based on the findings of the
preceding sections;
 Clear statement of recommendations arising including the
rationale for recommendations made.
15
Presentation, style and referencing
 Clear and professional written paper;
 Appropriate font style, size and line spacing, use of justified body
text;
 Clear presentation of figures, diagrams, images and tables;
 Free from spelling, typographical, syntax and grammatical errors.
 Comprehensive and accurate referencing of all sources used,
following Harvard Style.
10
TOTAL MARKS AVAILABLE: 100

Page 5 of 6
Edinburgh Napier University
School of Engineering and the Built Environment
Assessment Datasheet

1. Module number BSV11104
2. Module title Procurement Strategy
3. Module leader Dr Andrew Smith
4. Tutor with responsibility for this
Assessment
Susan Hanley
5. Assessment Coursework
6. Assessment Weighting
a) Overall module assessment
b) For this assessment
a) 100% coursework
b) This assessment is worth 50% of the
total module grade
7. Size and/or time limits for
assessment
2,000 words
8. Deadline of submission See previous page.
Your attention is drawn to the academic
regulations and the penalties for late
submission of the coursework.
9. Arrangements for submission Coursework should be submitted via the
Turnitin submission box within the module
space on Moodle by 4pm on the assessment
due date.
You are advised to keep your own copy of the
assessment.
10. Assessment Regulations All assessments are subject to the University
Regulations. It is the responsibility of the
student to know and abide by the University
Regulations. You can access the academic
regulations on the Napier web site by
accessing myNapier and selecting Academic
and Study Skills > Academic Regulations.
11. The requirements for the
assessment
Pay particular attention to the presentation of
your submission and remember that you are
providing professional research and/or
recommendations and your coursework should
be written in a professional manner.
All references to be provided using the
‘Harvard’ citation system.

Page 6 of 6

13. Return of work Grades will be made available by 15th May
2020, unless otherwise advised by the module
leader.
You will be advised by e-mail when grades and
feedback are available within Moodle.
14. Assessment criteria See previous page